Past Projects
LLU Dental Facility
Location: Loma Linda, CA
Owner: Loma Linda University
Architect: Aday Architects
Manager: Floor Plans Construction and Development Inc.
Size:
Description: Loma Linda has built a stat of the art dental facility for the school of dentistry. The build con sited of new administration offices, new dental labs, x ray machines, lobby, and conference room. 



LLU Command Center
Location: Loma Linda, CA
Owner: Loma Linda University
Architect: Adrian Gaus Architects
Manager: Floor Plans Construction and Development Inc.
Size:
Description:



Ashleys Furniture-Santa Ana
Location: Santa Ana, CA
Owner: Ashleys Furniture
Architect: Architecture Design Collaborative
Manager: HMC Construction Inc.
Size:
Description:



Rose Bowl Renovation
Location: Pasadena, CA
Owner: Rose Bowl Operating Co.
Architect: D'Agostino Izzo Quirk Architects, Inc.
Manager: Kar Construction/Bernards
Size:
Description:



CBU Nursing Facility
Location: Riverside, CA
Owner: California Baptist University
Architect: TR Design Group
Manager: Tovey Shultz Construction
Size:
Description: The CBU nursing project consisted of a renovation and addition to the existing nursing school facility.  The project houses the dean's office as well as the administration staff for the nursing program. Along with the admin portion of the building the project consisted of new nursing classrooms and patient rooms. For this project Rancho Pacific Electric provided lighting, lighting control, power distribution, branch power, low voltage systems, and fire alarm.



George Brown Generator
Location: San Bernardino, CA
Owner:
Architect:
Manager: Ledesma and Meyer Construction
Size:
Description: Installation of a new backup Generator



VESD District Office
Location: Victorville, CA
Owner: Victorville Elementary School District
Architect: WLC Architects
Manager: WLC Construction Services
Size:
Description: Remodel of a 60,000+ 2 story concrete tilt-up office building consisting of power and lighting systems, LED low voltage lighting system, security, fire alarm, and data.  



Chaffey College Ball Field Access and Parking Lot
Location: Rancho Cucamonga, CA
Owner: Chaffey College
Architect: Associated Engineers
Manager: Laird Construction
Size:
Description: New parking lot and ball field entry to included new lighting, lighting control, security systems, and parking lot permit pay systems.



Johnson Middle School Modernization Classroom Building
Location: Westminster, CA
Owner: Westminister School District
Architect: LPA
Manager: Tovey Shultz Construction
Size:
Description: New 2 story classroom building featuring lighting control, fire alarm, security, data network, and smart board systems.



Gerdau Steel Mill Fire Alarm System
Location: Rancho Cucamonga, CA
Owner: Gerdau Steel
Architect:
Manager: Champion Fire Systems
Size:
Description: Complete fire system through out the steel mill and administration offices



Monclair High School Science Classroom
Location: Montclair High School
Owner: Chaffey Joint Union High School District
Architect: WLC Architects
Manager: W.D. Gott Construction
Size:
Description: Remodel of a science classroom



ULV Davenport Dinning Hall
Location: La Verne, CA
Owner: University of La Verne
Architect:
Manager: KAR Construction
Size:
Description: the addition of an outsite commons area to support the campus dining facility



Claremont High School Theatre Remodel and Addition
Location: Claremont, CA
Owner: Claremont Unified School District
Architect: WLC Architects
Manager: Paul Miller Construction
Size:
Description:

remodel and expand the existing theatre with modrnaized lighting and power upgrades.




CMC North Mall
Location: Claremont, California
Owner: Claremont McKenna College
Architect:
Manager: Perrera Construction
Size:
Description: the construction of the common area for a mall on the campus of Claremont Mckenna College, the project includes new site lighting, utilizing LED lighting along with new supporting switchgear and lighting control systems



Stover Pedestrian Walk
Location: Claremont, CAlifornia
Owner: Pomona College
Architect:
Manager: Braeger Construction
Size:
Description: modernization of a pedestrian walkway to include new site lighting, supporting switch gear and lighting control systems.



Irvine Commons
Location: Redlands, CA
Owner: University of Redlands
Architect: Brian R. Bloom Architects
Manager: Tovey/Shultz Contruction, Inc.
Size:
Description: Remodel of the commons dinning facility at the University of Redlands



ULV Student Housing
Location: La Verne, CAlifornia
Owner: University of La Verne
Architect: KTGY
Manager: KAR Construction
Size:
Description: A LEED GOLD certified 103,712 sq ft 4 story building with 68 units and 256 beds for student housing.



ULV Bookstore
Location: La Verne, CAlifornia
Owner: University of La Verne
Architect: KTGY
Manager: KAR Construction
Size:
Description: the build out of a bookstore occupying the first floor of a 4 story student housing building for the University of La Verne



Santiago Middle School Fire Alarm modernization
Location: Anaheim, CA
Owner:
Architect:
Manager: Paul C. Miller Construction Inc.
Size:
Description:
New fire alarm system throughout entire campus



Villa Park High School Fire Alarm Modernization
Location: Villa Park, CA
Owner:
Architect:
Manager: Rancho Pacific Electric Inc.
Size:
Description: New fire alarm system throughout the entire campus



Scripps Athletic Facility and Parking Structure
Location: Claremont, CA
Owner: Scripps College
Architect:
Manager: Tovey Shultz Construction
Size:
Description: State of the art athletic facility and under ground parking with sports field on top



El Monte Aquatic Center
Location: El Monte, CA
Owner: City of El Monte
Architect:
Manager: Tovey Shultz Construction
Size:
Description: State of the art recreational aquatic facility for the city of El Monte



Dawn Distribution Center
Location: Ontario, CA
Owner: Dawn
Architect:
Manager: Majestic Realty/Commerce Construction
Size:
Description: 150,000 sq ft concrete tilt-up building



Citrus Plaza
Location: Redlands, CA
Owner: Majestic Realty
Architect:
Manager: Commerce Construction
Size:
Description: Outdoor shopping mall



Metro Point at South Coast
Location: Costa Mesa, CA
Owner: Arnel
Architect:
Manager: Arnel
Size:
Description: Outdoor shopping mall consisting of retail store, restraunts, and a movie theatre



Metro Pointe Bussiness Center
Location: Costa Mesa, CA
Owner: Arnel
Architect:
Manager: Arnel
Size:
Description: Metro Pointe Business Center is part of a 52 acre master planned environment. The project consisted of 4 buildings totaling over 300,000 sq. ft of office space.



Puente Hills Business Center
Location: City of Industry, CA
Owner: Arnel
Architect:
Manager: Arnel
Size:
Description: 14 acre master planned business campus with multiple multi story buildings



Sea View Business Park
Location: San Clemente, CA
Owner:
Architect:
Manager: United Pacific Construction
Size:
Description: This development consist of 15 single story buildings in the hills of the Rancho San Clemente Business Park



Casey Business Properties 3
Location: San Clemente, CA
Owner: Casey Business Properties
Architect:
Manager:
Size:
Description: 4 single story concrete tilt-up office buildings totaling 80,000 sq. ft. on 4 acres in the Rancho San Clemente Business Park



Swift Engineering
Location: San Clemente, CA
Owner: Matsushita International Corp
Architect:
Manager: United Pacific Construction
Size:
Description: race car engineering facility with aerodynamic wind tunnel testing equipment



San Clemente Business Park 2
Location: San Clemente, CA
Owner:
Architect:
Manager: United Pacific Construction
Size:
Description: Concrete tilt-up construction with glass front office TI



Rancho San Clemente Business Park 1
Location: San Clemente, CA
Owner:
Architect:
Manager: United Pacific Construction
Size:
Description: Concrete Tilt-up building



Esperanza High School Gym
Location: Anahiem, CA
Owner: PYUSD
Architect:
Manager: Paul C. Miller Construction
Size:
Description: New practice gymnasium



Eldorado High School Gym
Location: Placentia, CA
Owner: PYUSD
Architect:
Manager: Paul C. Miller Construction
Size:
Description: New practice gymnasium



Birch St. Elementary School
Location: Brea, CA
Owner: Brea Olinda Unified School District
Architect: LPA
Manager: Bernards
Size:
Description: Birch St. Elementary was a brand new facility consisting of 4 class room buildings, and administration building, a library and a food prep building. 



Scripps Performing Arts Center
Location: Claremont, California
Owner: Scripps University
Architect:
Manager: Tovey/Shultz Contruction, Inc.
Size:
Description: This project was a remodel of an existing performing arts center



Claremont Graduate University Student Housing
Location: Claremont, California
Owner: Claremont Graduate University
Architect:
Manager: Tovey/Shultz Contruction, Inc.
Size:
Description: This project consisted of 5 buildings each having 3 floors of student housing units



Mt. Sac Administration Building Remodel
Location: Walnut, CA
Owner: Mt. San Antonio College
Architect:
Manager: Bovis Lend Lease
Size:
Description:



Summit Intermediate Multipurpose Building Modernization
Location: Etiwanda, CA
Owner: Etiwanda School District
Architect: Higginson & Cartozian Architects, Inc.
Manager: Paul C. Miller Construction Inc.
Size:
Description:



Tri-City Community Day School
Location: San Bernardino, CA
Owner: San Bernardino County Superintendent of Schools
Architect: Higginson & Cartozian Architects, Inc.
Manager: paul C. Miller Construction Inc.
Size:
Description: New construction of a community day school consisting of 6 classrooms in 3 classroom buildings, an administration building, and a multipurpose building.



New Special Education Buildings at 3 locations
Location: Ontario, Chino, and Big Bear, California
Owner: San Bernardino County Superintendent of Schools
Architect: Frick, Frick & Jette Architects
Manager: Paul C. Miller Construction
Size:
Description: Ground up special education classroom building at three existing elementary schools



Centennial High School Addition
Location: Corona, CA
Owner: Corona/Norco USD
Architect: HMC Architects
Manager: Neff Construction
Size:
Description: Ground up two story classroom building.



Operations/Maintenance Center
Location: Riverside, CA
Owner: Western Municipal Water District
Architect: Ruhnau Ruhnau Clarke
Manager: Tilden Coil Constructors
Size:
Description: Two ground up buildings; operations/administration and maintenance center. LEED GOLD CERTIFIED



San Jacinto Valley Animal Shelter
Location: San Jacinto, CA
Owner: County of Riverside
Architect: Harley Ellis Devereauz
Manager: Tovey/Shultz Construction
Size:
Description: Ground up multi building animal shelter



ULV Abraham Campus Center
Location: La Verne, California
Owner: University of La Verne
Architect:
Manager: KAR Construction
Size: 45,000 SF 3 1/2 story
Description: 3 story 45,000 sq.ft,  student center, complete ground up construction. Consisting of Energy management and lighting control systems. LEED SILVER CERTIFIED



University of Redlands Armacost Library
Location: Redlands, California
Owner: University of Redlands
Architect: Brian R. Bloom Architects
Manager: Tovey/Shultz Contruction, Inc.
Size:
Description: remodel and addition of computer labs, offices and students areas.



CGU Academic Computer Building
Location: Claremont, California
Owner: Claremont Graduate University
Architect: Brian R. Bloom Architects
Manager: Tovey/Shultz Contruction, Inc.
Size:
Description: Tenant Improvement of 2 story building with computer labs and offices with an addition of a 3rd floor, New campus wire computing server, new back-up generator, ups support system for campus wire IT department.



Fontana Senior Center
Location: Fontana, California
Owner: City of Fontana
Architect: WLC Architects
Manager: Tovey/Shultz Contruction, Inc.
Size:
Description: ground up construction, 43,855 sq.ft 2 story building consisting of conference rooms, recreation areas, a dining hall, and a kitchen